|
ECI Millville 552 Atlantic Avenue Millville, Delaware 19967 (302) 537-8555 Fax (302) 537-8556 E-mail: ecide2@ecieng.com |
|
ECI Rehoboth 220 Rehoboth Avenue, P. O. Box 820 Rehoboth Beach, Delaware 19971 (302) 226-2844 (800) 403-4749 Fax (302) 226-2939 E-mail: eci@ecieng.com
|
|
WGMD RADIO SHOW TOPICS
|
|
What is a wastewater disposal system · A Wastewater disposal system utilizes biological processes to clean and treat wastewater prior to it reaching the ground water · Septic Tank · Distribution Box · Pump Tank · Drain Field
A non-working system can contaminate surface and groundwater, causes health problems, spread diseases, as well as create foul odors and leave unsightly messes.
How to maintain your wastewater disposal system · Pump out min. of every three years or as needed · Have your system inspected · Upgrade your system with access risers and a filter · Clean your septic filter · Check for and repair leaking faucets and toilets
Preventing Malfunctions · Conserve water · Do not do all the laundry in one day (Spread it out) · Do not use bleach or heavy household chemicals · Only human waste and toilet paper should be flushed · Do not install a garbage disposal · Prevent rainwater from collecting on wastewater disposal system · Do not drive or park cars or heavy equipment over the wastewater disposal system · Do not plant trees or shrubs near the wastewater disposal system
Signs of a Malfunctioning Wastewater disposal system · Toilet runs sluggish · The sound of gurgling in the pipes · Sewer odors in the house or in the yard · Wet areas/really green areas in the yard around the wastewater disposal system · Surfacing of raw sewage · Alarm sounds frequently · Backup of sewage into the house
|
|
PROFESSIONAL SURVEYING & ENVIRONMENTAL SERVICES
Acreage Surveys: Boundary, parcel, soils, wetlands delineation, etc.
Lot Survey (one acre or less): Includes field survey, corners marked with iron pipe and timber witness stakes, drafting, courthouse research, computations, written legal description (if requested) and three copies of the survey plat, signed and sealed by a Registered Land Surveyor.
Lot Survey & House Stakeout: Includes all services outlined in lot survey plus
Lot and Topographic Survey: Includes all services as outlined in lot survey, spot elevations and bench mark set based upon North American Vertical Datum of 1988 (NAVD88).
Lot and Location Survey: Includes all services as outlined in lot survey and illustrating the location of buildings and other above-ground features shown in relation to property lines.
Final Location Survey: Includes post-construction survey of building or house
Updated Survey: Surveys prepared by our firm, prior to one year before request for the updated survey.
Elevation Certificate (FEMA): Flood Certification & exhibits
Condominium Documents; Subdivision & Development of Properties; Commercial Site/Soil Testing Design
On-Site Septic Disposal Design: Standard Gravity Standard Pressure Engineered Design* Innovative/Alternative System Design* Large/Community/Municipal System Design *Includes One Time Construction Inspection
On-Site Wastewater Disposal System Inspection: Post 2002 Installation (Plus Pump-Out) Pre 2002 Installation (Plus Pump-Out) Pre 1985 Installation (Plus Pump-Out)
Chemical/Biological Sampling: Drinking Water Testing Stream & Pond Testing Mold Testing & Analysis
Environmental Site Investigated Services: Environmental Transaction Screen (ASTM E1528-06) Phase I Environmental Site Assessment (ASTM E1527-05)
TMDL Analysis (Total Maximum Daily Loads) Stormwater Management Analysis NPDES Permitting Erosion & Sedimentation CCR Services
|